Tank 4 Tank 1 Booster Pump Station Transmission Line
BID DATE
12/19/19 - 2:00
AGENCY
Eldorado Area Water Sanitation District
ESTIMATE
n/a
SCOPE
Separate sealed BIDS for the construction of a new booster pump station, flow meter and vault, and 6,700-foot 10" transmission line to convey water from Tank 4 to Tank 1; horizontal directional drill road crossings; and installation of a flow meter and vault on the discharge side of Booster Pump Station #1 at Tank 1 will be received by Eldorado Area Water & Sanitation District at 2 North Chamisa Drive, Santa Fe, New Mexico 87508
PREBID
11/21/2019 3:00