Lower Wyandotte Culvert Rehabilitation Emergency Repair
BID DATE
12/3/19 - 3:00
AGENCY
Oroville
ESTIMATE
$226,600
SCOPE
Removal and replacement of 59 linear feet of 72" CMP culvert under Lower Wyandotte Road, injection grouting around 200 linear feet of existing culvert to fill voids. 2-inch grind and overlay of existing roadway above the culvert and installation of curb, gutter, sidewalk, and one commercial driveway on one side of Lower Wyandotte Road. Gabriel Rodell, grodell@ben-en.com