Access the Full Project by Clicking here!
Bidjugde
JOB
W Chapman Avenue Infrastructure Improvements
BID DATE
11/21/19 - 11:00
AGENCY
Fullerton
ESTIMATE
$1,356,000
SCOPE
The project generally consists of removal and reconstruction of 8-inch VCP sewer mains, reconstruction of sewer manholes, and re-establishment of sewer lateral connections; construction of 6-inch PVC water mains; ductile iron fittings; valves and fire hydrant; water services; sheeting, shoring and bracing; street excavations; cold milling pavement; aggregate base; asphalt concrete; concrete access ramps, sidewalk, cross gutter/spandrel, curb and gutter; alley driveway approach; commercial driveway approach; adjusting manholes and water valves to grade; traffic control; striping; traffic loops, water pollution control; and all related work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT