Access the Full Project by Clicking here!
Bidjugde
JOB
Carnuel Water System Improvement Phase 2C
BID DATE
11/26/19 - 5:00
AGENCY
Albuquerque Bernalillo County Water Authority
ESTIMATE
n/a
SCOPE
The project has been prepared with a 2-part base bid and three bid alternates. The base bid consists of the installation of approximately 255 LF of 12” and 130 LF of 6” Water Transmission and Distribution pipeline along NM 333 including a 120-foot Jack and Bore under NM 333. Part A consists of various items to complete a previous phase, including hydrostatic testing. Appurtenances in both parts include valves, fire hydrants, water meters, and connection(s) to existing water transmission pipeline. Rock excavation may be required in the project area. Alternate 1 is 1,420 LF of 8” waterline along Camino El Alto Road along with water services and a fire hydrant. Alternates 2 and 3 include 1,660 LF of 12” Water Transmission pipeline within the roadway shoulder along Coyote Lane, Private Road and Old Road from the Carnuel Phase 3 Project. Appurtenances for the 12” transmission line extension bid alternates include the installation of air-relief valve and gate valves. Asphalt removal and replacement, and other existing features are included in this project. https://www.bidsync.com/bidsync-app-web/vendor/links/BidDetail.xhtml?bidid=2048662 ckelcourse@abcwua.org aswartswalter@bhinc.com
PREBID
11/12/2019 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT