Access the Full Project by Clicking here!
Bidjugde
JOB
Long Beach Conjunctive Use Expansion Palo Verde Pipeline Inerconnect
BID DATE
11/26/19 - 10:00
AGENCY
Long Beach
ESTIMATE
$400,000
SCOPE
The Work consists of removal of existing 8-inch interconnection piping and appurtenances, installation of new 12-inch flow meter and vault, 12-inch flow control valve, 12-inch backflow preventer, 12-inch ball valves, air and vacuum valve, low voltage electrical, flow and totalizer displays, and associated 12-inch piping work. Reconnection to the existing water systems includes disinfection and testing.
PREBID
11/19/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT