Chestnut Ave Overlay
BID DATE
02/11/14 - 3:00
AGENCY
Fresno
ESTIMATE
$782,000
SCOPE
The scope of work includes, but is not limited to: The removal and replacement of concrete curb ramps, modifications to existing median island noses, the replacement and installation of traffic signal loop detectors, grind of pavement surfaces, the placement of a 0.2 foot asphalt concrete overlay, raising of existing manhole and water valve lids, painting pavement striping and the installation of traffic signs, along with all associated appurtenances. Mike Brown Mike.Brown@Fresno.gov