Access the Full Project by Clicking here!
Bidjugde
JOB
Wastewater Treatment Plant New Effluent Line 2019
BID DATE
11/22/19 - 2:00
AGENCY
Los Lunas
ESTIMATE
n/a
SCOPE
Construct 24-inch Effluent Line and Outfall Structure a. Install approximately 1,240 feet of 24-inch diameter pipe with combination air release and vacuum station. b. Install 24-inch diameter pipe under the Upper Belen Riverside Drain with open trench-cut construction method. c. Construction concrete outfall structure. d. Construct piping modifications and valves to connect new 24-inch effluent to existing 16-inch effluent pipe. e. Install temporary bypass piping system to accommodate final piping connections. www.airplans.com
PREBID
10/30/2019 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT