Access the Full Project by Clicking here!
Bidjugde
JOB
Water Line Vernal Memorial Park
BID DATE
11/6/19 - 9:00
AGENCY
Uintah County
ESTIMATE
n/a
SCOPE
Water Line for Vernal Memorial Park Cut existing asphalt 18 inches wide over all needed trenches. Dig trench 2 feet deep. Haul all native soil away and dump on site. Install new waterline and 2-wire system in trench. Re-plumb line into existing valves in the system and wire 2-wire system into valves and clock. Back fill with 12 inches of sand for waterline and 2-wire and compact. Fill remaining trench with road base and compact level with existing asphalt. Trench specs: Pipe must be bedded in sand with minimum of four inches under the pipe and two inches above the top of the pipe and compacted. Remaining filling of trench with road base and compacted level with existing pavement. Thrust blocks at every Tee and elbow in the Line.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT