Walnut Avenue Drainage Street Improvement
BID DATE
11/12/19 - 11:00
AGENCY
El Segundo
ESTIMATE
n/a
SCOPE
As described in the Bidding Documents, the bids are for a public works project (“Project”) which consists of demolition, potholing, surveying, as well as the installation of, complete-in place, a new catch basin, reinforced 18-inch-diameter concrete pipe, and a six-foot-wide longitudinal gutter. The project will also require removal and replacement of driveway approaches, an alley approach, curb and gutter, and asphalt pavement, as well as other improvements as specified on the bid schedule on the 500 block of East Walnut Avenue as shown on the plans on file with the City’s Public Works Department.