Access the Full Project by Clicking here!
Bidjugde
JOB
(JOC) Concrete
BID DATE
10/18/19 - 5:00
AGENCY
Washington Terrace
ESTIMATE
$2,500,000
SCOPE
The Contractor will be responsible for concrete projects within the City including: curb, gutter, and sidewalk removal and replacement, driveway and ADA approaches repair and replacement with, and various flatwork. All concrete projects Remove and replace of various damaged or raised 4’ and 6’ sidewalk sections.  Remove and repair cause of cement damage such as tree roots, or other cause. If damage is caused by utilities, coordinate necessary repairs with the affected utility as directed by the Public Works Department.  Remove and replace damaged or raised driveway and ADA approaches. Install Truncated Dome pad to specification of the Public Works Department.  Remove and replace various damaged flat work.  Remove and replace various damaged or raised 30” curb and gutter. Jakem@washingtonterracecity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT