Street Overlay Slurry Seal 2018 2019 CIP
BID DATE
11/12/19 - 2:00
AGENCY
Tracy
ESTIMATE
n/a
SCOPE
The Project is more specifically defined in the Contract Documents, but generally includes the following work to be done. Removal of top ±5 in. of pavement on El Portal Street till the existing concrete subgrade and installing ±5 in of AC (Asphalt Concrete) overlay, removal of 3” of AC on 12th Street, Highland Ave, and Duncan Drive and installing 3 in. of AC overlay, and removal of 2” of AC on American Legion Parking Lot and replacing with 2 in. of AC Overlay. The limits are indicated on the plans. The work also includes pavement repair and slurry sealing the various streets within the City of Tracy, installation of drop inlet, curb ramps, signage and striping. anju.pillai@cityoftracy.org