Access the Full Project by Clicking here!
Bidjugde
JOB
CA FLAP NEV 40 Donner Pass Road
BID DATE
01/29/20 - 2:00
AGENCY
Department Transportation
ESTIMATE
$14,000,000
SCOPE
The project is located just west of Truckee, California and will rehabilitate the existing pavement and widen shoulders for bike lanes on 6.54 miles of Donner Pass Road from I-80 Exit 174 in Soda Springs, CA to the Truckee City limits. Selected pullouts will also be paved and improvements include drainage, signing, striping, and guardrail. The proposed typical section is a 22 foot traveled way with 4 foot paved shoulders serving as Class II bike lanes. The bike lanes will be on the uphill direction only, east of Donner Pass. The bike lanes will be in both directions, west Donner Pass. Work will not be conducted on Rainbow Bridge. The elevation of Donner Pass is 7,056 feet. SIGNIFICANT QUANTITIES (Schedule A): Roadway Excavation = 7,500 CY Rock Excavation = 195 CY Aggregate Base = 12,000 CY Asphalt Pavement = 20,000 TONS Guardrail = 6,000 LF Erosion Control = LPSM Traffic Control = LPSM CFLAcquisitions@dot.gov https://www.fbo.gov/index.php?s=opportunity&mode=form&tab=core&id=469d3641aac60dc7d7d00c8f82db047b&_cview=0
UPDATES