Magnolia Ave Storm Drain
BID DATE
10/24/19 - 10:00
AGENCY
Chino
ESTIMATE
$810,000
SCOPE
Remove and replace approximately 1,300 lineal feet of reinforced concrete storm drain pipe from 18” to 36” in diameter, replace and compact trench materials as required. Supply and construct junction structures and catch basins. Remove brick and mortar plug in existing 36” reinforced concrete pipe and construct brick and mortar plug in new 24” reinforced concrete pipe. Remove, dispose and replace PCC curb and gutter, sidewalk and accessibility ramps at various locations including near an elementary school. Provide and install trench drain with filter fabric under a porous concrete cross gutters and spandrels. Remove and place asphalt concrete as required by the Project Plans. Remove and replace asphalt and cold mill as required by the Project Plans. Mario Flores mflores@cityofchino.org