Access the Full Project by Clicking here!
Bidjugde
JOB
Magnolia Channel Desilting Basin Earthwork
BID DATE
10/10/19 - 3:00
AGENCY
Inland Empire Utilities
ESTIMATE
n/a
SCOPE
Load, haul-away, and dispose of silt material currently located within a desilting (settling) basin. The basin is concrete lined and the silt material has been drying all summer. The area is approximately 16,000 square feet and the accumulated silt material ranges from 3-feet to 4-feet deep. Access to the site is provided from Mountain Avenue, in Chino. Harlan Delzer - 909-993-1707 hdelzer@ieua.org
PREBID
10/3/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT