Magma Flood Retarding Structure Erosion Mitigation
BID DATE
10/30/19 - 10:00
AGENCY
Magma Flood Control District
ESTIMATE
$2,500,000
SCOPE
The project includes the 1) removal and disposal of existing vegetation from the approx. 5.5 mile long flood retarding structure embankment, 2) ripping, cross ripping, and dozer tracking the embankment slopes, 3) installation of hydroseed, and 4) placement of rock mulch over the hydroseed. The contract will be let to the lowest responsible bidder. The successful contractor shall be required to reach Final Completion within one hundred eighty (180) calendar days after the Notice to Proceed. The construction contract amount is estimated to be between $1,500,000 - $2,500,000. kent@azmfcd.org