Access the Full Project by Clicking here!
Bidjugde
JOB
Bake Parkway Domestic Water Zone 5 4 Fire Flow PRV Pipeline
BID DATE
09/26/19 - 2:00
AGENCY
Irvine Ranch WD
ESTIMATE
$500,000
SCOPE
The Bake Parkway Domestic Water Zone 5 to 4 Fire Flow PRV and Pipeline Project consists of open cut construction of approximately 1,100 linear feet of 8-inch domestic water PVC and ductile iron pipeline in Bake Parkway in the City of Lake Forest, construction of a buried 8-inch pressure reducing valve vault located behind sidewalk, connections to existing Zone 4 and Zone 5 pipelines within the street right-of-way, appurtenances, pressure testing, disinfection, backfill, pavement restoration, traffic control, and erosion and sediment control. Toni Lynch - 949-453-5410 lynch@irwd.com
PREBID
9/5/2019 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT