Access the Full Project by Clicking here!
Bidjugde
JOB
1700 South Park Blacksmith Fork River Footbridge
BID DATE
10/1/19 - 2:00
AGENCY
Logan
ESTIMATE
n/a
SCOPE
Construction of pedestrian bridge over the Logan River, including concrete abutments, preengineered and pre-manufactured steel bridge, and cast-in-place concrete deck. Installation of solar powered pedestrian activated rapid flash beacon system, including signs and crosswalk markings. bill.young@loganutah.org russ.akina@loganutah.org lori.mathys@loganutah.org
PREBID
9/20/2019 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT