Access the Full Project by Clicking here!
Bidjugde
JOB
Santa Fe River La Joya Street River Bank Stabilization Repair Phase 3B Flood Damage
BID DATE
09/27/19 - 2:00
AGENCY
Santa Fe
ESTIMATE
n/a
SCOPE
The work designated CIP 500 C: Santa Fe River at La Joya Street River Bank Stabilization Repair (Phase 3b) AND Flood Damage Repair, Ricardo Bridge to Don Jose Storm Drain Outfall consists of, but is not limited to: channel grading, construction of bank stabilization structures, slope protection, and rehabilitation of the stormwater channels as described in the Contract Documents.
PREBID
9/17/2019 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT