WWTP Solids Handling Improvements 2019
BID DATE
11/14/19 - 10:00
AGENCY
Camp Verde
ESTIMATE
n/a
SCOPE
The Project Number 19-136 known as “WWTP Solids Handling Improvements 2019”, is the construction of eight concrete lined 146’ X 33’ drying bed cells, a 300’ X 138’ concrete solids processing area, two 430’ X 137’ sludge drying lagoons, as well as all the associated underdrains, piping, valves, roads, driveways, pumps & pumping stations, slabs, etc. as is shown on the attached plans. The project is to be built entirely as one construction project funded by the Town of Camp Verde Wastewater Division. Troy Odell (928) 554-0826 troy.odell@campverde.az.gov