Access the Full Project by Clicking here!
Bidjugde
JOB
La Habra Splash Pads Brio Park Oeste Park A Community Development
BID DATE
10/10/19 - 10:00
AGENCY
La Habra
ESTIMATE
$1,900,000
SCOPE
The work comprises the furnishing of all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of but not be limited to Mobilization; Preparation and Implementation of Storm Water Best Management Practices; Preparing Wet-Stamped Engineering Drawings and Structural Calculations; Obtaining Building Permit; Installing Water Splash Pad Features Structures; Excavation; Earthwork, Demolition and Site Clearing, Installing Security Lighting, Seat Walls, Tube Steel Fence, Landscaping; Connections to Storm Drain, Sewer and Water Pipes; Concrete Flatwork; Install Shade Sail Canopy; Regrading and Restoring Landscaping; and all associated work as identified on the construction drawings in the City of La Habra.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT