Expansion Malibu Hills Rd Stormwater Enhancement
BID DATE
10/10/19 - 2:00
AGENCY
Calabasas
ESTIMATE
n/a
SCOPE
The Expansion of Malibu Hills Road Stormwater Enhancement Project to be constructed consists of the construction of three center medians on a segment of Malibu Hills Road between Agoura Road and Lost Hills Road. Two of the center medians will be bio‐ filtration medians equipped with impermeable liner and an underdrain to serve as a pretreatment Best Management Practice (BMP) that will capture and treat surface flows. The project also consists of connections to two existing catch basins located on Malibu Hills Road; one located on the segment of Malibu Hills Road between Agoura Road and Lost Hills Road and the other located between Lost Hills Road and the road terminus. afarassati@cityofcalabasas.com