Access the Full Project by Clicking here!
Bidjugde
JOB
Adonis Lift Station Force Main
BID DATE
09/26/19 - 4:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
The Town intends to construct a new lift station and 2,670 feet of force main to convey wastewater flows from the Adonis MHP collection system to the Town of Marana collection and treatment system. The Town also intends to discontinue use of the existing wastewater evaporation basins and to decommission the existing lift station that currently serves the Adonis MHP. This will allow wastewater from the Adonis MHP to be treated at the Marana Water Reclamation Facility. At the new lift station, the project will include a standby generator and SCADA connectivity to communicate with the Town’s existing system. The project also includes an access road that provides vehicle access to the new lift station. Rudy Torres (520) 382-1983 rtorres@maranaaz.gov
PREBID
9/11/2019 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT