Dried Solids Storage Area
BID DATE
10/9/19 - 2:00
AGENCY
Turlock
ESTIMATE
$2,485,000
SCOPE
The scope of work includes construction of a bio solids laydown area at the Turlock Regional Water Quality Control Facility and consists of earthwork, installation of drainage facilities, installation of recycled water distribution pipes and connections, concrete washdown area, vactor dump facility, electrical duct bank installation, site lighting, concrete curb and gutter, and asphalt concrete paving. sfremming@turlock.ca.us engineering@turlock.ca.us