Access the Full Project by Clicking here!
Bidjugde
JOB
Sidewalk Pvt Bolio Rd
BID DATE
09/9/19 - 2:00
AGENCY
Department Army
ESTIMATE
$5,000,000
SCOPE
The objective of this procurement is for the construction of a pedestrian sidewalk along Pvt. Bolio Road on Presidio of Monterey, CA, from Hachiya Way to Building 358, to install an entrance sidewalk from the fence line at Pvt. Bolio Gate to the visitors' center, and install a concrete pad with supports for a historic cannon. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to install a precast concrete boardwalk walkway along Private Bolio Road, an at grade concrete sidewalk from Army St. to the cottages, a concrete entrance sidewalk near the Private Bolio Gate, and a concrete support pad underneath the cannon. This includes, but is not limited to: excavation, grading, support systems, structure, accessible curb ramps, catch basins, pipe, drainage rock, and crosswalk paint as defined in this PWS. Brittney Wilson, Contract Specialist brittney.j.wilson4.civ@mail.mil Phone: 831-242-4078

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT