Access the Full Project by Clicking here!
Bidjugde
JOB
Otay Mesa Truck Route Phase IV
BID DATE
10/29/19 - 2:00
AGENCY
San Diego
ESTIMATE
$8,330,000
SCOPE
Otay Truck Route Phase IV provides for the construction of an additional travel lane to the existing truck route for the truck traffic entering the Otay Mesa Border Crossing POE and to provide a travel lane for Border Patrol and emergency vehicles. The project limit begins at La Media Road and ends at Drucker Lane. The Project proposes replacing existing roadway pavement and subgrade. K-rails are also added to maintain the lane assignments. The project also proposes improvements such as new storm drains and green infrastructure along Otay Truck Route. The following items of work need to be completed within three months (63 Working Days) of NTP for Stage 1: clearing and grubbing, remove and replace subgrade, install retaining wall, salvage and reinstall fences, install new fence with slats, relocate parking lot lights, install parking lot curb and striping, install Jointed Plain Concrete Pavement with aggregate base and asphalt treated permeable base, install biofiltration basin, install and relocate k-rail, install decomposed granite, and construct curb and gutter on the north side of the Otay Truck Route. Antoinette Sanfilippo - 619-533-3439 asanfilippo@sandiego.gov
UPDATES