Access the Full Project by Clicking here!
Bidjugde
JOB
Walnut Storm Water Capture Groundwater Replenishment Basin I 173
BID DATE
08/29/19 - 3:00
AGENCY
Torrance
ESTIMATE
$745,000
SCOPE
The Walnut Basin Project will enhance and reconstruct an existing, but unused above-ground storage basin, with a capacity to hold up to 50 AF at one time. It will install a storm water diversion structure to divert storm water to the basin for recharge instead of allowing it to flow two miles away to an impaired water body, Machado Lake. The existing basin has not been used for storm water capture for more than 30 years. The storm water will be collected from a 56-acre residential area surrounding the Walnut Basin. PublicWorkInfo@TorranceCA.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT