Access the Full Project by Clicking here!
Bidjugde
JOB
Los Angeles Street Waterline
BID DATE
01/31/14 - 11:00
AGENCY
Shafter
ESTIMATE
$125,000
SCOPE
WORK INCLUDES THE INSTALLATION OF 1,925 lf OF 12" C900 PVC ALONG LOS ANGELES STREET IN THE CITY OF SHAFTER. THE CONRACTOR WILL BE BE RESPONSIBLE FOR TIE-IN AT EXISTING BLOW-OFF WHICH WILL BE REINSTALLED AT THE END OF THE PROPOSED LINE. Tel:(661) 746-5002 x5039 Fax:(661) 746-9125 csoto@shafter.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT