Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Water Production Wells ASR Wells Phase 2
BID DATE
11/7/19 - 7:00
AGENCY
Phoenix
ESTIMATE
$29,500,000
SCOPE
Well with sounding tube o Monitor well (ASR wells only) o Pump, column pipe/tube assembly, and motor for the wells (including monitor wells) o Piping from the existing distribution line to the new well (Source line for ASR wells only) o Arsenic or nitrate treatment system (Production wells only) o Water flush lubrication system o Pump and motor for the well o Ancillary equipment related to the well (flow-meter, pressure sustaining valve, bypass valve, and pressure transducer) o Instrumentation and connections to Supervisory Control and Data Acquisition (SCADA) system to fully automate the well o Electrical power feed to all new equipment o Chlorination system and piping o If ASR well, dechlorination system and piping o Pump to waste system to sewer o Piping to distribution main
UPDATES