Outside Main Canal Russell Avenue Bridge Replacement
BID DATE
09/26/19 - 1:00
AGENCY
Fresno County Public Works
ESTIMATE
$3,600,000
SCOPE
The work to be done consists, in general, of replacing the existing bridge with a cast-in-place double box culvert approximately 83 feet in length with headwalls and retaining walls at each end. An onsite temporary detour will be constructed to route traffic away from the culvert and a cofferdam will be constructed to divert water in the canal during construction. Installation of a wick drainage system, overburden fills and settlement monitoring will also be required to consolidate soft site soils prior to construction of the box culvert, retaining walls, and final paving. DesignServices@fresnocountyca.gov