Access the Full Project by Clicking here!
Bidjugde
JOB
Vermont Stormwater Capture Green Street Phase II
BID DATE
09/18/19 - 10:00
AGENCY
Los Angeles
ESTIMATE
$1,638,000
SCOPE
In 3 areas around Vermont Ave from Gage to Florence: Remove and/or reconstruct/replace: street, curb & gutter, sidewalks, alleys, etc to install Infiltration trenches Permeable pavement, sidewalks Storm drain system with Catch basins Bike-safe gratings MHs Hydrodynamic separator Bus shelter Signage Trees & tree wells Landscaping eng.plandist@lacity.org
PREBID
8/20/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT