Access the Full Project by Clicking here!
Bidjugde
JOB
(RFP) Waterway Replacement
BID DATE
08/29/19 - 4:00
AGENCY
Tooele County
ESTIMATE
n/a
SCOPE
AWARD 9/3: This project will include the following: sawcutting and removing the asphalt, curb and gutter, sidewalk, and waterway at Site 1 (Exhibit A,) and installing storm drain pipe, curb catch basins, and combo box. It is proposed to replace the associated sidewalk, curb and gutter, and asphalt in the disturbed project limits. The goal of the project is to make the intersection more easily passable while still retaining the storm drainage conveyance. The second intersection located at Site 2 (Exhibit A,) will involve similar activities, only the existing 4’ wide waterway is proposed to be replaced with a 6’ waterway, also with the goal of making the intersection more easily passable and to replace the degrading waterway. The project effort includes right of way improvements for two intersections according to the design drawings attached as Exhibit F. The project should include estimates for the following:  Demolition (Site clearing, saw cutting, disposal)  Street and Right of Way Improvements (pavement markings, curb & gutter, asphalt, sidewalk, waterway)  Storm Drainage Improvements (18” RCP, curb (2) catch basins, (1) 4’ dia. cleanout, flared end section, etc.)  Misc. (sign relocation, mobilization, traffic control, etc.) jclegg@ensignutah.com
PREBID
8/19/2019 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT