Module 4 Phase 1 Base Liner System Kiefer Landfill
BID DATE
08/29/19 - 2:00
AGENCY
Sacramento County
ESTIMATE
$23,800,000
SCOPE
The work under this contract includes furnishing labor, equipment, and materials to construct the Module 4, Phase 1 base liner system and related structures, including excavating and stockpiling of soils, geosynthetics installation, and construction of the leachate collection and removal system (LCRS) and side slope riser piping. The lined area is approximately 32 acres. Work also includes the removal of existing, and construction of new, surface water and drainage structures, and removal of 1,850 ft. of existing paved road and paving of 5,950 ft. of new perimeter road. Rachel Davis (916) 876-9425 davisrac@saccounty.net
PREBID
8/13/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT