Access the Full Project by Clicking here!
Bidjugde
JOB
Misc Concrete Improvements 2020
BID DATE
08/9/19 - 2:00
AGENCY
Pasadena
ESTIMATE
$600,000
SCOPE
This project consists primarily of the removal and replacement of portions of damaged concrete improvements including curb, gutter, sidewalk, colored sidewalk, driveway apron, cross gutter, spandrel, culverts and local depressions; construction of curb ramps and installation of detectable warning tiles; localized street reconstruction including the removal of existing asphalt concrete pavement, PCC pavement and subgrade, the compaction of the subgrade, and placement of crushed aggregate base and asphalt concrete pavement; tree root pruning/cutting; and miscellaneous appurtenant work at various locations in the City.Sheldon Reservoir Site Enhancement located on Arroyo Boulevard from 150 feet north of La Cresta Drive to Coniston Road will consist primarily of the excavating existing soil surface and construct meandering sidewalk. The sidewalk will be 5 feet in width and approximately 550 feet in length. It also includes removal and replacement of portions of damaged concrete improvements including curb, gutter, sidewalk, driveway apron, spandrel; construction of curb ramps and installation of detectable warning surface; localized street reconstruction including the removal of existing asphalt concrete pavement, the compaction of the subgrade, and placement of crushed aggregate base and asphalt concrete pavement; tree root pruning/cutting; grading; excavating and hauling of existing soil; and miscellaneous appurtenant work within project limits. Public Works Engineering - 626-744-7403 tan@cityofpasadena.net
PREBID
7/30/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT