Access the Full Project by Clicking here!
Bidjugde
JOB
DEMA Waterline Replacement Buckeye Readiness Center
BID DATE
08/4/19 - 5:00
AGENCY
AZDEMA
ESTIMATE
n/a
SCOPE
[STANDARD CONSTRUCTION CO INC LINCOLN CONSTRUCTORS INC FPS Civil LLC Full Frame Construction LINCOLN CONSTRUCTORS INC ACTION DIRECT LLC] The waterline from the Chlorinator to the Fire Pump house needs to be replaced. The current pipe used is insufficient and not rated for the intended use and location. Contractor shall excavate dirt and material to access the pipe, approximately 7 to 8 foot deep. The trench is partially open at this time and backfill material is on site. 2.3. Contractor shall remove approximately 87 feet of 3” HDPE pipe from trench and dispose of properly. Any and all metal valves will be returned to service if operating correctly. Remove and return to owner, a new patch coupler from the HDPE pipe prior to disposal. 2.4. Contractor shall remove failing saddles from Chlorinator and dispose of properly. Provide and install two new Brass Saddles 3” x 1” on the approximately 87 feet of new 3” Ductile Iron Pipe. lisa.ledbetter@azdema.gov
UPDATES