Access the Full Project by Clicking here!
Bidjugde
JOB
Deer Hollow Park Upper Detention Basin Swale Improvements
BID DATE
08/1/19 - 2:00
AGENCY
North Salt Lake
ESTIMATE
n/a
SCOPE
he work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for the excavation and removal of approximately 468 cubic yards of soil, the installation of 152 linear feet of 6’ wide steel reinforced concrete swale, the installation of a 22’x21’concrete reinforced swale around an existing box drain and the reseeding of the detention basin; all in accordance with the Drawings and Specifications prepared by the North Salt Lake City Engineering Department. gary.kobzeff@nslcity.org
UPDATES