Access the Full Project by Clicking here!
Bidjugde
JOB
MV 4 Lift Station Replacement
BID DATE
09/11/19 - 11:00
AGENCY
Fort Mojave Indian Tribe
ESTIMATE
$500,000
SCOPE
The contractor shall furnish all labor, equipment, and material necessary to: • Mobilize and demobilize necessary heavy equipment, including backhoe; • Conduct site work including, but not limited to clearing and grubbing, and trenching/excavation; • Dewater site for lift station installation; • Install lift station, pumps guide rails, plumbing tree, valves and related appurtenances; • Install electrical lines, conduit and connections; • Install forcemain, sewer main and manholes; • Install gravel, crushed rock and rick-rap; • Install Fence and Gates; • Perform Startup, As-Builts and O&M Manuals; • Abandon existing wetwell, manholes, sewer mains and forcemains. Bryan Hickstein bhickstein@fmtua.com https://www.contractorsplanroom.com/secure/project/?step=addconfirmed&projectid=306364
UPDATES