Access the Full Project by Clicking here!
Bidjugde
JOB
South Valley Regional Airport Taxilane Rehabilitation
BID DATE
08/1/19 - 1:00
AGENCY
Salt Lake
ESTIMATE
n/a
SCOPE
This project will resurface the taxilanes that provide access to the existing T-hangars and shade hangars at the South Valley Regional Airport. The aprons in this project were constructed before 1995. The surface will be cold milled to a depth of 3 inches, the existing base course material will be re-compacted, and the area repaved with new bituminous surface course material. The T-hangar and shade hangar aprons at South Valley Regional Airport are showing areas of cracking rutting and loose aggregate, creating a foreign object debris concern. The surfaces have also become oxidized and brittle over time. The existing asphalt surfaces have been in place for more than 23 years, during which time they have received only periodic maintenance to fill cracks and repair minor deficiencies. The Pavement Condition Indices for these pavements is in the 14 - 34 range indicating serious to very poor pavements. Resurfacing and/or reconstruction of the taxilanes will restore the pavement integrity and prolong the service life of the pavement. Bob Bailey bob.bailey@slcgov.com Mark Carlton mark.carlton@slcgov.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT