Access the Full Project by Clicking here!
Bidjugde
JOB
Conduit and Structures Installation for the Plaza Substation
BID DATE
01/31/14 - 11:30
AGENCY
Riverside
ESTIMATE
$800,000
SCOPE
This project consists of the installation of a duct system from the Plaza Substation to the intersection of Riverside Ave & Merrill Ave. It includes the installation of a 36 diameter steel casing to be installed under the railroad tracks and the core drilling of an existing manhole wall, as well as the installation of , approximately 2000 of new conduits and vaults.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT