La Palma Avenue Richfield Rd Storm Drain Extension Storm Water
BID DATE
07/25/19 - 2:00
AGENCY
Anaheim
ESTIMATE
$2,470,000
SCOPE
The work will consist excavation and installing a storm drain system, removal of conflicting storm drain pipes; modifying an existing vault structure and manhole; construction of a vault structure, junction structure, manhole, dry well and Rip raps; reconstructing the streets; and other items of work required to complete the scope of work detailed in the plans and specifications. David Mori - 714-765-5148 dmori@anaheim.net