40th Street Detention Pond (REBID)
BID DATE
02/25/20 - 10:30
AGENCY
South Ogden
ESTIMATE
n/a
SCOPE
Stapp Construction - $675,800 The work consists of constructing 400 l.f. of storm drain pipe; manholes; connections to the existing storm drain; abandoning existing storm drain pipe; detention pond outlet structure; 2000 c.y. of import material for earthen embankment; sprinkler system; sod or hydro-seeding; sprinkling system and controller; 8,500 s.f. of concrete sidewalk and all other related items and appurtenances as directed in the Contract Documents.