Access the Full Project by Clicking here!
Bidjugde
JOB
CA NPS BP 2017 Bridge Preservation Yosemite
BID DATE
07/10/19 - 2:00
AGENCY
Department Transportation
ESTIMATE
$3,000,000
SCOPE
This project consists of bridge preservation to include thin epoxy overlay, concrete repair, bridge railing repair and replacement, repair structural timber and lumber on bridge, placing partially grouted riprap to protect bridge abutments, bank stabilization, and other items of work. Work will require stringent traffic control measures and careful erosion control measures to include stream diversions, turbidity curtains, and scour protection.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT