Access the Full Project by Clicking here!
Bidjugde
JOB
Street Improvements Widening College Avenue Flintridge Dr
BID DATE
07/18/19 - 11:00
AGENCY
Bakersfield
ESTIMATE
$836,000
SCOPE
The work to be performed consists, in general, of demolition of existing improvements; roadway excavation; construction of new roadway pavement consisting of aggregate base (Class 2) and hot mix asphalt (HMA Type A); installation of new street lights; constuction of concrete curb and gutter, sidewalk, drive approaches and V-gutter; construction of a mechanically stabilized embankment (MSE) retaining wall, including structure excavation, structure backfill, and installation of geogrid soil reinforcement and an underdrain system; removal and relocation or salvage of existing roadway signs; installation of new roadway signs; removal of existing traffic striping and pavement markings; placement of new traffic striping and pavement markings; construction of new chain link fence and fence gates; and relocation of existing mast arm signal heads and signs at the intersection of Fairfax Road/College Avenue. Cathy Mojibi cmojibi@bakersfieldcity.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT