Access the Full Project by Clicking here!
Bidjugde
JOB
Downtown Complete Streets Implementation Phase 1A 1B 2A
BID DATE
07/30/19 - 2:00
AGENCY
San Diego
ESTIMATE
$2,430,000
SCOPE
This Project proposes improving mobility in Downtown San Diego by installing ADA compliant curb ramps and creating a network of cycle way facilities throughout downtown. The current construction plan (Phases 1A-1B-2A) includes installing cycle tracks along Beech Ave, 6th Ave, J Street, C Street and Park Blvd. The work also proposes street resurfacing, traffic signal modifications, striping, signage, installation of flexible post delineators, replacement of existing curb, gutter, and sidewalks affected by the curb ramp upgrades. Spencer Deane - 619-533-5265 SDeane@sandiego.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT