Prospect Avenue Beryl Street Del Amo Street Resurfacing
BID DATE
07/17/19 - 9:00
AGENCY
Redondo Beach
ESTIMATE
$750,000
SCOPE
The work includes asphalt and concrete removals, street construction, driveway and alley approaches, cross gutter and spandrel construction, ADA curb ramp construction, utility adjustment, cross gutter replacement, slot paving, signing and striping, traffic loop detector installation, traffic signal modifica- tion and other items per plans and specifications. RedondoEngineering@Redondo.org