Access the Full Project by Clicking here!
Bidjugde
JOB
Aaron Lane Water Main
BID DATE
07/1/19 - 3:30
AGENCY
Prescott Valley
ESTIMATE
$132,000
SCOPE
This work consists primarily of installation of approximately 350 linear feet of 12-inch waterline along the east side of Aaron Lane, between Copperhill Drive and Frontage Road (State Route 69) in the Town of Prescott Valley, Arizona. Pipe material used for the project will be Class 350 DIP. The proposed 12-inch waterline will connect several waterlines together. This project will also remove approximately 350 linear feet of an existing waterline that is 250 feet west of Aaron Lane. Bill Osborne (928) 759-3083 bosborne@pvaz.net
UPDATES