Access the Full Project by Clicking here!
Bidjugde
JOB
Paradise Creek Water Quality Community Enhancements
BID DATE
07/9/19 - 2:00
AGENCY
National City
ESTIMATE
$1,323,000
SCOPE
The project shall convey storm water flow collected from Paradise Creek to a biofiltration detention basin from treatment. The project will install a diversion structure to convey flows from Paradise Creek to the forebay and biofiltration detention basin; install slope stability and erosion control measures surrounding the biofiltration basin that may include, but is not limited to, native trees, shrubs, mulch, and/or drought tolerant landscaping to reduce the sediment pollutant loads from entering the biofiltraion detention basin during and after a storm event; install underdrain and an overflow structure downgradient of the biofiltration detention basin; and install an emergency overflow spillway. Luca Zappiello - (619) 336-4360 lzappiello@nationalcityca.gov
PREBID
7/2/2019 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT