Access the Full Project by Clicking here!
Bidjugde
JOB
Tara Hills Pedestrian Infrastructure
BID DATE
07/2/19 - 2:00
AGENCY
Contra Costa County
ESTIMATE
$450,000
SCOPE
The work to be done generally consists of installing 26 curb ramps in the Tara Hills residential area. The curb ramps will be placed on Shamrock Drive, Dolan Way, and Flannery Road. Bulb-outs will be installed at the intersection of Dolan Way and Flannery Road. Other project work includes drainage modifications, sign replacement, and thermoplastic striping and pavement markings
PREBID
6/17/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT