Access Road W PCH San Francisco Ave Cast Iron Water Main Replacement
BID DATE
07/11/19 - 10:00
AGENCY
Long Beach
ESTIMATE
$878,500
SCOPE
The Work shall include but not limited to furnishing all labor, equipment and materials necessary to remove and dispose of existing 6-inch/8-inch/12-inch pipe, fittings and appurtenances; installation of new 8 inch/12-inch ductile iron pipe, fittings and valves; installation of 14-inch steel casing; pavement restoration; traffic control; appurtenant items such as pavement removal, excavation, backfill and compaction, thrust blocks and anchors, pressure testing and disinfection, tie-ins, fire hydrants, blow-off valves, and service connections; and all other work necessary to complete this project. Eduardo Lomeli - 562-570-2340 Eduardo.Lomeli@lbwater.org