JOB
Zone 3 Reservoir Transmission Main
BID DATE
09/2/19 - 5:00
AGENCY
West Jordan
ESTIMATE
$1,700,000
SCOPE
PreQual due 7/2, bids 7/5: Construction of approximately 5497 feet of new 20-inch PVC water transmission main and 1696 feet of 12” PVC water distribution and 896 feet of 8” PVC water pipe and associated improvements. • Construction of approximately 1072 feet of 12” Sewer Pipe and 819 feet of 8” sewer pipe, and 1023 feet of 24” storm drain pipe and 321 feet of 18” storm drain pipe. • Connections to existing piping, testing and commissioning of new main. Danyce Steck +1 801-569-5009 danyce.steck@westjordan.utah.gov Brooke Smith +1 801-264-2662 bsmith@murray.utah.gov