Midas Creek East Trail
BID DATE
07/11/19 - 3:00
AGENCY
Herriman
ESTIMATE
n/a
SCOPE
The Midas Creek West Trail Connector is new construction and will require the clearing, excavation and installation 2,875 linear feet of 10’ Wide asphalt pedestrian trail and 10’ wide equestrian RAP trail inside a 20’ wide trail corridor, 165 linear feet of 8’ wide pedestrian trail, 209 linear feet of 6’ concrete sidewalk, removal of 75 linear feet of existing asphalt trail, 4,619 SFF of rockery retaining wall, one (1) 50’ pedestrian/equestrian bridge and two (2) 60’ pedestrian/equestrian bridges along with the corresponding concrete bridge supports/abutments and reseeding in disturbed areas. Contractor shall provide all permits, materials, and labor to complete the project as designed. Jonathan Bowers +1 801-466-5323 jbowers@herriman.org